Emergency Repair Works on Kotulo – El Wak Road B9

This project was part of the El Nino Emergency Repair works carried out by the Office of the President and funded by the World Bank. The Project involved spot repair works on  54 Km of this road section. The works comprised construction of RC drifts, gabion protection works, earthworks, gravel works, mitre drains, side drains and heavy grading works.

 

 
   
© 2008 Ogle Construction Limited| All Rights Reserved
Web Solution by Palm Technologies